No. | Year | PROJECT NAME | Client | Specification | |||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Liquid | Type | Cpacity | Materials | Number | Applied Code | ||||||
Capacity (Net Working) |
Tank Size | Shell | Lower Column |
Item/Set | |||||||
1 | 2018 | Vietnam LSP Tank Farm | POSCO E&C | HP Ethylene | Spherical Tank | 3648.4 ㎥ | 1/2 | ASME Sec.VIII, Div.2 | |||
2 | 2018 | Vietnam LSP Tank Farm | POSCO E&C | HP Prophylene | Spherical Tank | 6206.0 ㎥ | 1/1 | ASME Sec.VIII, Div.2 | |||
3 | 2018 | Vietnam LSP Tank Farm | POSCO E&C | HP Off-space Propylene | Spherical Tank | 1630.0 ㎥ | 1/1 | ASME Sec.VIII, Div.2 | |||
4 | 2018 | Vietnam LSP Tank Farm | POSCO E&C | Mixed C4s | Spherical Tank | 3382.0 ㎥ | 1/3 | ASME Sec.VIII, Div.1 | |||
5 | 2018 | Vietnam LSP Tank Farm | POSCO E&C | Butadiene | Spherical Tank | 4126.0 ㎥ | 1/3 | ASME Sec.VIII, Div.1 | |||
6 | 2018 | Vietnam LSP Tank Farm | POSCO E&C | Butadiene | Spherical Tank | 4126.0 ㎥ | 1/2 | ASME Sec.VIII, Div.1 |
No. | Year | PROJECT NAME | Client | Specification | ||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Liquid | Type | cpacity | Materials | Number | Applied Code | |||||||
Containment | Wall Type |
Capacity (Net Working) |
Tank Size | Shell | Lower Column |
Item/Set | ||||||
1 | 2013 | Ammonia | Single | Double | 1/1 | API 620 Annex R | ||||||
2 | 2013 | Ethylene | Single | Double | 1/1 | API 620 Annex Q | ||||||
3 | 2014 | Ammonia | Single | Double | 1/1 | API 620 Annex R | ||||||
4 | 2015 | KwangYang LPG | POSCO E&C | LPG | Single | Double | 36145 ㎥ | 1/1 | API 620 Annex R | |||
5 | 2016 | Ammonia | Single | Double | 1/1 | API 620 Annex R | ||||||
6 | 2017 | LET | KTT Plant | Ethylene | Single | Double | 4000 ㎥ | 1/1 | API 620 Annex Q | |||
7 | 2018 | Oman Salalah LPG | Winteco | Propane/ Butane |
Single | Double | 47248 ㎥ | 2/2 | API 620 Annex R | |||
8 | 2018 | Ammonia | Single | Double | 1/2 | API 620 Annex R | ||||||
9 | 2018 | Vietnam Hyosung Ethylene | KTT Plant | Ethylene | Single | Double | 8040 ㎥ | 1/1 | API 620 Annex Q | |||
10 | 2018 | Vietanm LSP Tank Farm | POSCO E&C | LPG | Single | Double | 77529 ㎥ | 1/2 | API 620 Annex R | |||
11 | 2018 | Vietanm LSP Tank Farm | POSCO E&C | Ethylene | Single | Double | 23051 ㎥ | 1/1 | API 620 Annex Q | |||
12 | 2018 | Vietanm LSP Tank Farm | POSCO E&C | Prophylene | Single | Double | 16548 ㎥ | 1/1 | API 620 Annex R | |||
13 | 2018 | LIQUEFIED GAS STORAGE TANK | KOREA AIR-TECH | NITROGEN | Single | Double | 7560 ㎥ | 1/1 | API 620 Annex Q | |||
14 | 2018 | LIQUEFIED GAS STORAGE TANK | KOREA AIR-TECH | OXYGEN | Single | Double | 2700 ㎥ | 1/1 | API 620 Annex Q |
No. | Year | PROJECT NAME | Client | Type | Number | Applied Code | Work Scope |
---|---|---|---|---|---|---|---|
1 | 2018 | Sin-Gori Nuclear Power Plant Unit 5,6 Field Tank | Moo Jin Kee Yeon Co. | CRT | 8/16 | API 650 | Strength Cal, Detail Drawing |
2 | 2018 | Sin-Gori Nuclear Power Plant Unit 5,6 Field Tank | Moo Jin Kee Yeon Co. | DRT | 2/6 | API 650 | Strength Cal, Detail Drawing |
4 | 2018 | DRT | 1/1 | API 650 | Detail Drawing | ||
6 | 2018 | [NWC] Water Storage Tank | GS E&C | CRT [Truss] | 2/2 | API 650 | Strength Cal, Detail Drawing, FE Analysis |
7 | 2018 | Oman Salalah LPG Project (ATM) | Winteco | CRT | 5/7 | API 650 | Drawing |
8 | 2018 | Oman Salalah LPG Project (ATM) | Winteco | FRT | 1/1 | API 650 | Drawing |
9 | 2018 | CRT | 8/12 | API 650 | Detail Drawing, FE Analysis | ||
10 | 2018 | DRT | 15/29 | API 650 | Detail Drawing, FE Analysis | ||
11 | 2018 | FRT | 3/6 | API 650 | Detail Drawing, FE Analysis | ||
14 | 2018 | [Shoaibah RO] Desing for Sulfuric Acid Tank | Doosan Heavy Industries & Construction | DRT | 1/1 | API 650 | Strength Cal, Detail Drawing |
12 | 2019 | [JSTT] TK-N807 TANK | KTT Plant | CRT | 1/1 | API 650 | Strength Cal, Detail Drawing |
13 | 2019 | [DEHCH] Tank Increases Construction Work | DONG IL INDUSTRY Co. | CRT | 2/7 | API 650 | Strength Cal, Detail Drawing |
No. | Year | PROJECT NAME | Client | Specification | Engineering Scope | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Liquid | Cpacity | Materials | Number | Applied Code | Strength Cal. | Detail Drawing | CP&BOM | FEM Analysis | ||||||
Capacity (Net Working) |
Tank Size | Shell | Lower Column | Item/set | ||||||||||
1 | 2018 | Vietnam LSP Tank Farm | POSCO E&C | HP Ethylene | 3648.4 ㎥ | 1/2 | ASME Sec.VIII, Div.2 |
1. Engineering Drawing 2. Strength Calculation 3. Vendor Print Review    - Strength Calculation Sheet    - Fabrication Drawings    - FE Analysis Reports |
||||||
2 | 2018 | Vietnam LSP Tank Farm | POSCO E&C | HP Prophylene | 6206.0 ㎥ | 1/1 | ASME Sec.VIII, Div.2 | |||||||
3 | 2018 | Vietnam LSP Tank Farm | POSCO E&C | HP Off-space Propylene | 1630.0 ㎥ | 1/1 | ASME Sec.VIII, Div.2 | |||||||
4 | 2018 | Vietnam LSP Tank Farm | POSCO E&C | Mixed C4s | 3382.0 ㎥ | 1/3 | ASME Sec.VIII, Div.1 | |||||||
5 | 2018 | Vietnam LSP Tank Farm | POSCO E&C | Butadiene | 4126.0 ㎥ | 1/3 | ASME Sec.VIII, Div.1 | |||||||
6 | 2018 | Vietnam LSP Tank Farm | POSCO E&C | Butane-1 | 3648.0 ㎥ | 1/2 | ASME Sec.VIII, Div.1 | |||||||
7 | 2018 | MFC | KTT Plant | Mixed C4s | 4126.3 ㎥ | 1/3 | ASME Sec.VIII, Div.2 | o | o | o | o | |||
8 | 2018 | MFC | KTT Plant | C4-Raffinae | 3208.9 ㎥ | 1/3 | ASME Sec.VIII, Div.2 | o | o | o | o | |||
9 | 2018 | MFC | KTT Plant | HP Ethylene | 3208.9 ㎥ | 1/2 | ASME Sec.VIII, Div.2 | o | o | o | o |
No. | Year | PROJECT NAME | Client | Type | Specification | Applied Code | Work Scope | ||
---|---|---|---|---|---|---|---|---|---|
Max. Cpacity | Number | ||||||||
Capacity (Net Working) |
Tank Size | Item/set | |||||||
1 | 2018 | Sin-Gori Nuclear Power Plant Unit 5,6 Field Tank | Moo Jin Kee Yeon Co. | CRT | 8/16 | API 650 | Strength Cal | ||
2 | 2018 | Sin-Gori Nuclear Power Plant Unit 5,6 Field Tank | Moo Jin Kee Yeon Co. | DRT | 2/6 | API 650 | Strength Cal | ||
3 | 2018 | [NWC] Water Storage Tank | GS E&C | CRT [Truss] | 2/2 | API 650 | Strength Cal | ||
4 | 2018 | Y-T78 Tank | SK Engery | CRT | 1/1 | API 650 | Strength Cal | ||
5 | 2018 | 7710-FA/FB plus 3 items | SK Engery | CRT | 4/4 | API 650 | Strength Cal | ||
6 | 2018 | Y-T3 Tank | SK Engery | CRT | 1/1 | API 650 | Strength Cal | ||
7 | 2018 | Y-T3 Tank | SK Engery | CRT | 1/1 | API 650 | Strength Cal | ||
8 | 2018 | Y-T315 Tank | SK Engery | CRT | 1/1 | API 650 | Strength Cal | ||
9 | 2018 | Y-T328 Tank | SK Engery | CRT | 1/1 | API 650 | Strength Cal | ||
10 | 2019 | Y-T9310 Tank | SK Engery | CRT | 1/1 | API 650 | Strength Cal | ||
11 | 2019 | P-T3707 Tank | SK Engery | CRT | 1/1 | API 650 | Strength Cal | ||
12 | 2019 | Y-T344 / Y-T9401A Tank | SK Engery | CRT | 1/1 | API 650 | Strength Cal | ||
13 | 2019 | P-T1981 Tank | SK Engery | CRT | 1/1 | API 650 | Strength Cal | ||
14 | 2019 | Y-T18 plus 12 items | SK Engery | CRT | 13/13 | API 650 | Strength Cal | ||
15 | 2019 | [JSTT] TK-N807 TANK | KTT Plant | CRT | 1/1 | API 650 | Strength Cal | ||
16 | 2019 | [DEHCH] Tank Increases Construction Work | DONG IL INDUSTRY Co. | CRT | 2/7 | API 650 | Strength Cal | ||
17 | 2018 | Oman Salalah (LPG) | Winteco | DWST | 47248 ㎥ | I.D 41 x H35.0 m | 2/2 | API 620 Annex R | Strength Cal |
18 | 2018 | Vietnam Hyosung (Ethylene) | KTT Plant | DWST | 8040 ㎥ | I.D 22 x H24.3 m | 1/1 | API 620 Annex Q | Strength Cal |
19 | 2018 | Vietanm LSP Tank Farm (LPG) | POSCO E&C | DWST | 77529 ㎥ | I.D 64 x H28.2 m | 1/2 | API 620 Annex R | Strength Cal |
20 | 2018 | Vietnam LSP Tank Farm (Prophylene) | POSCO E&C | DWST | 23051 ㎥ | I.D 36 x H26.8 m | 1/1 | API 620 Annex Q | Strength Cal |
21 | 2018 | Vietnam LSP Tank Farm (Ethylene) | POSCO E&C | DWST | 16548 ㎥ | I.D 35 x H21.1 m | 1/1 | API 620 Annex R | Strength Cal |
22 | 2018 | LIQUEFIED GAS STORAGE TANK (Nitrogen) | KOREA AIR-TECH | DWST | 7560 ㎥ | I.D 21 x H24.3 m | 1/1 | API 620 Annex Q | Strength Cal |
23 | 2018 | LIQUEFIED GAS STORAGE TANK (Oxygen) | KOREA AIR-TECH | DWST | 2700 ㎥ | I.D 15 x H18.2 m | 1/1 | API 620 Annex Q | Strength Cal |
24 | 2018 | Vietnam LSP Tank Farm (HP Ethylene) | POSCO E&C | Spherical | 3648.4 ㎥ | I.D 19.1 x H22.65 m | 1/2 | ASME Sec.VIII, Div.2 | Strength Cal |
25 | 2018 | Vietnam LSP Tank Farm (HP Prophylene) | POSCO E&C | Spherical | 6206.0 ㎥ | I.D 22.8 x H26.40 m | 1/1 | ASME Sec.VIII, Div.2 | Strength Cal |
26 | 2018 | Vietnam LSP Tank Farm (Prophylene) | POSCO E&C | Spherical | 1630.0 ㎥ | I.D 14.6 x H18.10 m | 1/1 | ASME Sec.VIII, Div.2 | Strength Cal |
27 | 2018 | Vietnam LSP Tank Farm (Miexed C4s) | POSCO E&C | Spherical | 3382.0 ㎥ | I.D 19.5 x H23.05 m | 1/3 | ASME Sec.VIII, Div.1 | Strength Cal |
28 | 2018 | Vietnam LSP Tank Farm (Butadiene) | POSCO E&C | Spherical | 4126.0 ㎥ | I.D 19.9 x H23.45 m | 1/3 | ASME Sec.VIII, Div.1 | Strength Cal |
29 | 2018 | Vietnam LSP Tank Farm (Butane-1) | POSCO E&C | Spherical | 3648.0 ㎥ | I.D 19.1 x H22.65 m | 1/2 | ASME Sec.VIII, Div.1 | Strength Cal |
30 | 2018 | MFC (Mixed C4s) | KTT Plant | Spherical | 4126.3 ㎥ | I.D 19.9 x H23.35 m | 1/3 | ASME Sec.VIII, Div.2 | Strength Cal |
31 | 2018 | MFC (C4-Raffinae) | KTT Plant | Spherical | 3208.9 ㎥ | I.D 18.3 x H21.65 m | 1/3 | ASME Sec.VIII, Div.2 | Strength Cal |
32 | 2018 | MFC (HP Ethylene) | KTT Plant | Spherical | 3208.9 ㎥ | I.D 18.3 x H21.65 m | 1/2 | ASME Sec.VIII, Div.2 | Strength Cal |
MFR | Date | Title | Item Type | Work Scope |
---|---|---|---|---|
GS Caltex | 2017-12-14 | Heat Treatment Analysis for Repaired Pressure Vessel | Pressure vessel | Thermal Transient Analysis Stress Analysis |
2017-12-13 | FFS Assessment for Pressure Vessel including Flow like Crack | Pressure vessel | ASME FFS-1 Fintness-for-Servicse Assessment | |
FFS Assessment for Pressure Vessel including Flow like Crack | Pressure vessel | ASME FFS-1 Fintness-for-Servicse Assessment | ||
Doosan Mecatec | 2017-12-11 | [2017C007,2017C0008:150-VR-003 plus 3 ITEMS] Fatigue Analysis | Pressure Vessel | Fatigue Assessment |
2017-12-19 | [2016C0038:C-4001] FE Analysis | Pressure Vessel | Thermal Anlaysis, Stress Analysis | |
Doosan Heavy Industries & Construction | 2017-09-01 | [JWPR-OBRC] Design for desulfurization facility | Absorber, Silo, Hopper, Storage Tank | Strength Calculation, Drawing, FE Analysis |
2017-09-28 | [Boryeong#3] Fatigue analysis for feed water heater | HP & LP heater | Fatigue Analysis | |
2017-09-28 | Analysis for SH Site Tank | Cone Roof Tank | Strength Calculation, Drawing | |
2017-10-19 | [Obra-C/Jawaharpur] Design for site Tank | Cone Roof Tank, Rectangular Storage Tank | Strength Calculation, Drawing, FE Analysis | |
2017-11-10 | Shin-Kori Nuclear Power Plant Unit 5,6 Field Tank | MSR (heat Exchanger) | FE Analysis | |
2017-12-18 | Fatigue analysis for feed water heater | HP & LP heater | Fatigue Assessment | |
Winteco Co. | 2017-10-30 | [OMAN SALALAH LPG] Design for Propane & Butane Tank | Double Wall Storage Tank (propane/ Butane) | Drawing, CP & BOM, FE Analysis |
KTT Plant Co. | 2017-08-04 | Design for quotation of Ethylene Tank | Double Wall Storage Tank (Ethylene) | Strength Calculation, Engineering Drawing |
2017-09-25 | [T-FB105D] Design for LP Ethylene Tank | Strength Calculation, Engineering Drawing | Strength Calculation, Engineering Drawing |
MFR | Date | Title | Item Type | Work Scope |
---|---|---|---|---|
GS Caltex | 2018-02-13 | FFS Assessment for Pressure Vessel including Flow like Crack | Pressure vessel | ASME FFS-1 Fintness-for-Servicse Assessment |
2018-11-20 | FFS Assessment for Air Cooler including Flow like Crack | Air Cooler | ASME FFS-1 Fintness-for-Servicse Assessment | |
2018-07-30 | [Salalah Ammonia] Analysis for bottom heating system | DWST | FE Analysis | |
2018-11-09 | SALALAH AMMONIA PROJECT | DWST | FE Analysis | |
Doosan Mecatec | 2018-01-09 | [2017C0047:S-1128A plus 5 items] FE analysis | Pressure Vessel | Thermal Anlaysis, Stress Analysis |
2018-01-25 | [2016C0017:T:81011A] FE analysis (additional order) | Pressure Vessel | Thermal Anlaysis, Stress Analysis | |
2018-04-27 | [2017C0090:TM3200VE001 plus 1 item] FE analysis | Pressure Vessel | Thermal Anlaysis, Stress Analysis | |
2018-05-30 | [2018C0021:1510-D-014 plus 1 item] FE analysis | Pressure Vessel | Thermal Anlaysis, Stress Analysis | |
2018-06-14 | [2018C0003:S-MR-201CR plus 1 item] FE analysis | Pressure Vessel | Thermal Anlaysis, Stress Analysis | |
2018-07-03 | [2017C0082:103R001] FE analysis | Pressure Vessel | Thermal Anlaysis, Stress Analysis | |
2018-07-05 | [2017C0083,2017C0084:80C001 plus 5 items] FE analysis | Pressure Vessel | Thermal Anlaysis, Stress Analysis | |
2018-10-05 | [2018C0024:121-D plus 2 items] FE analysis | Pressure Vessel | Thermal Anlaysis, Stress Analysis | |
2018-10-17 | [2018C0050:R-902] FE analysis | Pressure Vessel | Thermal Anlaysis, Stress Analysis | |
2018-12-17 | [2018C0055:010C0001 plus 7 items] FE analysis | Pressure Vessel | Thermal Anlaysis, Stress Analysis | |
2018-12-18 | [2018C0057:019V0003 plus 2 items] FE analysis | Pressure Vessel | Thermal Anlaysis, Stress Analysis | |
2018-12-21 | [2018C0049:019C0006] FE analysis | Pressure Vessel | Thermal Anlaysis, Stress Analysis | |
Doosan Heavy Industries & Construction | 2018-08-29 | Fatigue analysis for feed water heater | HP & LP heater | Fatigue Assessment |
Winteco | 2018-05-02 | NATURALIZATION TANK CFD | Dome Roof Storage Tank | CFD Analysis |
2018-07-17 | OMAN SALALAH LPG PROJECT (3D Modeling) | Double Wall Storage Tank (propane/ Butane) | 3D Modeling | |
GS E&C Co. | 2018-02-23 | FE analysis for Air Cooler | Heat Exchanger | Thermal Anlaysis, Stress Analysis |
G.M.Tec.Co. | 2018-11-16 | Engineering Service(Nitrogen, Oxygen) | DWST (2items /2sets) | FEA Analysis, Strength Calculation, Drawing |
KTT Plant | 2018-05-28 | FE analysis | Cone Roof Strorage Tank | FE Analysis |
2018-07-31 | Hyosung vina Chemicals PP4 Project | Double Wall Storage Tank (Ethylene) | FE Analysis | |
POSCO E&C | 2018-10-27 | [Vietnam LSP Tank Farm Project] Engineering Service (DWST,SPT) | DWST (3items/4set), Spherical Tank(6items/12sets) | FEA Analysis, Strength Calculation, Drawing |
MFR | Date | Title | Item Type | Work Scope |
---|---|---|---|---|
2019-04-17 | [Central Electric C.C BISKRA] Design for Site Tank (additional order) | Storage Tank | Drawing | |
2019-04-17 | [Central Electric C.C JIJEL] Design for Site Tank (additional order) | Storage Tank | Drawing | |
Doosan Mecatec | 2019-02-12 | [18C0060:120C-02 plus 2 items] FE analysis | Pressure Vessel | Thermal Anlaysis, Stress Analysis |
2019-02-14 | [18C0059:120V-002 plus 2 items] FE analaysis | Pressure Vessel | Thermal Anlaysis, Stress Analysis | |
2019-03-11 | [18C0096:21DA-01 plus 3 items] FE analysis | Pressure Vessel | Thermal Anlaysis, Stress Analysis | |
Doosan Heavy Industries & Construction | 2019-01-22 | [Obra-C/Jawaharpur] Outline and design for Site Tank | Storage Tank | Drawing, FE Analysis |
2019-01-22 | [JWPR-OBRC] Design for FGD (additional order) | Storage Tank | Drawing, FE Analysis | |
2019-04-30 | [Obra-C] FE analysis for Shop Tank | Storage Tank | Drawing, FE Analysis | |
Moo Jin Kee Yeon Co. | 2019-03-20 | FE analysis for protect panel for the sloshing of Fresh Water Tank | Storage Tank | Drawing, FE Analysis |
GS E&C | 2019-02-19 | [NWC IN NORTH KUWAIT plus 1 item] FE analysis for lifting | Storage Tank | FE Analysis |